1
1
1
2
3
The Raipur–Bilaspur Expressway is a 127-km, 4/6-lane tolled expressway linking Raipur and Bilaspur, two major cities in Chhattisgarh. It is the state’s busiest highway and a key link between the capital and the northern part of the state. It is a brownfield project that forms part of NH-30 and NH-130, and it was inaugurated in May 2019.
Raipur–Bilaspur Expressway: All Details
| Detail | Info |
|---|---|
| South end | Tatibandh Chowk, Raipur |
| North end | Darrighat, Bilaspur |
| Length | 127 km |
| Lanes | 4/6 lanes (4 lanes on Bilaspur–Sargaon, 4–6 lanes on Simga–Raipur) |
| Type | Brownfield, operational |
| Highways | Part of NH-30 and NH-130 |
| Opened | May 2019 |
| Cost | About ₹1,550 crore (₹15.5 billion) |
| Main toll plazas | 3 |
| Speed limit | No official figure found |
| Car toll | Not found, check NHAI for current rates |
| Pavement | Concrete, designed for loads of up to 20 tonnes |
Route details and location
Speed limit
Toll fee
FAQ
How long is it?
127 km.
Is it a true access-controlled expressway?
Not entirely. It is a 4/6-lane tolled highway with bypasses and interchanges, upgraded from the older road.
When did it open?
May 2019.
How long does the drive take?
It isn’t stated in the sources I found. A typical car journey is about 2–2.5 hours (my estimate, not from the sources).
Will it be upgraded?
Yes. Plans for the Raipur–Ranchi–Dhanbad Expressway include converting this section to six lanes.
Is this the same as the Raipur–Visakhapatnam Expressway?
No. That is a separate 464-km greenfield project under construction.
Are there safety facilities?
Yes: SOS booths, CCTV and a toll-free helpline.