Popular Posts

Raipur Bilaspur Expressway, Chhattisgarh

Raipur Bilaspur Expressway, Chhattisgarh: Route Details, Location, Length, Speed Limit, Toll Fee and FAQ

The Raipur–Bilaspur Expressway is a 127-km, 4/6-lane tolled expressway linking Raipur and Bilaspur, two major cities in Chhattisgarh. It is the state’s busiest highway and a key link between the capital and the northern part of the state. It is a brownfield project that forms part of NH-30 and NH-130, and it was inaugurated in May 2019.

Raipur–Bilaspur Expressway: All Details 

Detail Info
South end Tatibandh Chowk, Raipur
North end Darrighat, Bilaspur
Length 127 km
Lanes 4/6 lanes (4 lanes on Bilaspur–Sargaon, 4–6 lanes on Simga–Raipur)
Type Brownfield, operational
Highways Part of NH-30 and NH-130
Opened May 2019
Cost About ₹1,550 crore (₹15.5 billion)
Main toll plazas 3
Speed limit No official figure found
Car toll Not found, check NHAI for current rates
Pavement Concrete, designed for loads of up to 20 tonnes

Route details and location

  • It runs from Raipur (Tatibandh) through Simga and Sargaon to Bilaspur (Darrighat), all within Chhattisgarh.
  • The work was done in three packages, including a 36-km four-lane stretch from Bilaspur to Sargaon and a 48-km four-to-six-lane stretch from Simga to Raipur.
  • Features include seven bypasses around congested areas, two interchanges, 35 underpasses and 15 bus bays.
  • Safety measures include SOS booths, a toll-free helpline and CCTV cameras every 5 km.
  • It is planned to become part of the larger Raipur–Ranchi–Dhanbad Expressway (707 km), where this section would be upgraded to six lanes.

Speed limit

  • I couldn’t find an official posted limit in the sources. It is a tolled highway rather than a fully access-controlled expressway, and the limits vary by vehicle type and zone. Follow the signage on the road.

Toll fee

  • The sources confirm 3 main toll plazas but don’t give current rates by vehicle class. Rates are revised periodically, so check NHAI or the FASTag/toll app for the exact fare.
  • FASTag is the usual payment method on Indian national highways.

FAQ

How long is it?

127 km.

Is it a true access-controlled expressway?

Not entirely. It is a 4/6-lane tolled highway with bypasses and interchanges, upgraded from the older road.

When did it open?

May 2019.

How long does the drive take?

It isn’t stated in the sources I found. A typical car journey is about 2–2.5 hours (my estimate, not from the sources).

Will it be upgraded?

Yes. Plans for the Raipur–Ranchi–Dhanbad Expressway include converting this section to six lanes.

Is this the same as the Raipur–Visakhapatnam Expressway?

No. That is a separate 464-km greenfield project under construction.

Are there safety facilities?

Yes: SOS booths, CCTV and a toll-free helpline.

Leave a Reply

Your email address will not be published. Required fields are marked *